KAZAKHYMS-ALARKO BOZSHOKOL COPPER PLANT

Kazakhmys-Alarko Bozshokol Copper Plant – 2014

Erection of steel structures of Main maintance and Wash Bay Buildings. Totally 1100 ton

Kazakhmys-Alarko Bozshokol Copper Plant – 2013

Painting of steel structure of Grinding Building 12500 ton

Kazakhmys-Alarko Bozshokol Copper Plant – 2012

Erection of anchors for Grinding Building. Totally 80 ton

GALLERY